South Ghawar Gas Separation Project, Saudi Aramco
Actron Global delivered execution-led field installation and commissioning support for a critical Super Duplex stainless steel piping system at the South Ghawar Gas Separation Plant for JGC. The scope included full procedure qualification and controlled execution within a remote location, delivered over a tightly managed six-month programme.
Project Overview
Actron Global delivered execution-led field installation and commissioning support for a critical Super Duplex stainless steel piping system at the South Ghawar Gas Separation Plant for JGC. The scope included full procedure qualification and controlled execution within a remote location, delivered over a tightly managed six-month programme.
Scope of Work
- Procedure qualification and control
- Field installation of Super Duplex stainless steel piping
- Prefabrication and erection of piping and supports
- Tie-ins and dismantling of existing pipework
- Valve installation and testing
- System testing and verification
- Pre-commissioning support
Project Context
JGC required the rapid delivery of a high-specification Super Duplex stainless steel piping system for the South Ghawar Gas Separation Plant, executed under strict quality and regulatory controls.
The scope demanded full procedure qualification, alongside compliance with Saudi Aramco requirements for welding inspection, quality control, and non-destructive testing. Field installation, tie-ins, testing, and pre-commissioning activities had to be executed within a tightly controlled six-month schedule.
The project’s location in the Empty Quarter introduced additional complexity. Fast mobilisation, disciplined execution, and strict adherence to safety and quality standards were essential within a remote and logistically demanding operating environment.
Project Snapshot
Client
Technicas Reunidas
Owner
Saudi Aramco
Sector
Oil & Gas | Gas Compression | Infrastructure
Province
Eastern Province
Actron’s Role
Actron Global was appointed by JGC to deliver the complete Super Duplex stainless steel piping package.
Our specialist execution team, comprising approximately 61 technical professionals — including Saudi Aramco-approved quality personnel, welding inspectors, and NDT coordinators — was mobilised within a short turnaround period to meet programme requirements.
Delivery covered prefabrication, installation, and erection of piping and supports, execution of tie-ins, dismantling works, valve installation, and structured testing activities. Procedure qualification were maintained throughout, supported by disciplined inspection, quality assurance, and fully traceable documentation processes.
Energy-conscious site practices were applied during installation and testing phases to optimise temporary power usage and support efficient constructability in the remote environment.
The Outcome
The critical Super Duplex stainless steel piping line was installed and commissioned successfully and on schedule, meeting all technical, quality, and regulatory requirements.
The project demonstrates Actron Globals’ capability to deliver high-specification piping works in remote and demanding environments, rapidly mobilise specialist execution capability, and maintain rigorous compliance under tight programme constraints for leading EPC clients.
Looking for embedded project management or technical consultancy support in Saudi Arabia?
Let’s discuss how Actron can strengthen your delivery performance.
- Deep familiarity with Aramco GI/SAEP and site procedures
- Multi-discipline manpower pipeline (Welding, Piping, Mech, E&I, Ops)
- Safety-first culture — PTW/LOTO, audits & disciplined turnover dossiers
Trusted Partners
Safety First
Global Standards

Talk to our team
Need a proposal or quick man power mobilization?

Let’s Build Together
Ready to deliver your next project with precision, safety and speed?